INDEPENDENT DATA. PUBLIC RECORDS. CLEARER DECISIONS.
PermitLedger.

AUSTIN · THE LOCAL RECORD

Interior Alteration permits in 78751

Published population statistics, from application to issuance. Every figure is drawn from the latest available period for this cell.

Median days to issue

3

City of Austin Issued Construction Permits (Socrata 3syk-w9eu) · 2026 · n = 53
Period: 2025-11-03 to 2026-11-03

Calculation note

Median of days_to_issue (issue_date - applieddate, calendar days) over issued permits in the cell and period, computed from PTL_Permits. Founding period is the trailing 12 months of issued permits.

25th percentile · days

0

City of Austin Issued Construction Permits (Socrata 3syk-w9eu) · 2026 · n = 53
Period: 2025-11-03 to 2026-11-03

Calculation note

Percentile of days_to_issue over issued permits in the cell and period, computed from PTL_Permits.

75th percentile · days

7

City of Austin Issued Construction Permits (Socrata 3syk-w9eu) · 2026 · n = 53
Period: 2025-11-03 to 2026-11-03

Calculation note

Percentile of days_to_issue over issued permits in the cell and period, computed from PTL_Permits.

Permits issued

53

City of Austin Issued Construction Permits (Socrata 3syk-w9eu) · 2026 · n = 53
Period: 2025-11-03 to 2026-11-03

Calculation note

Count of issued permits in the cell and period, from PTL_Permits.

Permit Pressure Index

55.2

City of Austin Issued Construction Permits (Socrata 3syk-w9eu) · 2026 · n = 53
Period: 2025-11-03 to 2026-11-03

Calculation note

Permit Pressure Index (deterministic): 100 x (0.625 x median_component + 0.375 x trend_component), where median_component = min(cell median / citywide class median, 2.0) / 2.0 and trend_component = cell volume this period / (cell volume this + prior period). The package formula's pending-share input (weight 0.2) is not published by the issued-permits dataset (applications never issued are not in it), so the two available inputs are renormalized from 0.5/0.3 to 0.625/0.375 at founding and disclosed here.

Citywide interior alteration timelineExplore the timeline estimatorSee public permits

PermitLedger publishes public permit records and population-level statistics. It does not rule on permit requirements for any specific project, and a contractor's permit footprint is a public record, not a rating, license, or endorsement.